
I'm getting close to doing the wiring for the bike so I've started working on the dash and control box which will have my light and kill-switch controls. I've mounted my switches in to the box (the status LEDs are next) and modified the inside to be easy-opening.

The dash, as you can see, is kind of 2-leveled with a slope connecting the two pieces. When I get the rest of my gauges (which unfortunately could be a month away) I'll be finishing that piece up. But since they are on such a delay I may cut some PVC to size and finish the mountings before then.
No comments:
Post a Comment